行业资讯
冷再生施工租赁场地的准备工作
来源:https://www.sddhfjx.com/ 日期:2023-06-16
(1)直接填筑的路基基底,冷再生机租赁施工前必需经过检查签证;需求停止地基处置的基底必需完成各项处置,并满足地基处置的请求。
(1) The roadbed base directly filled must undergo inspection and certification before the rental construction of the cold recycling machine; The foundation that requires cessation of foundation disposal must complete all disposal tasks and meet the requirements for foundation disposal.
(2)场地应该保证足够的平整度,满足设备、人员进场请求。
(2) The site should ensure sufficient flatness to meet the requirements for equipment and personnel entry.
(3)做好场地的暂时排水和防雨措施。依照施工运量和施工机械的大荷载建筑施工便道。
(3) Take temporary drainage and rainproof measures for the site. According to the construction traffic volume and construction machinery, a large load construction road is constructed.
做好相关人员的技术培训和技术交底工作,使参与施工的全体人员充沛认识高速铁路路基填筑的关键技术、质量控制要点。
Provide technical training and disclosure to relevant personnel, so that all personnel involved in the construction can fully understand the key technologies and quality control points of high-speed railway roadbed filling.
劳动力、机械设备配置人员、机械设备应依据施工计划组合工期请求停止合理的配置。
Labor force, mechanical equipment allocation personnel, and mechanical equipment should be requested to stop reasonable allocation based on the construction plan and construction period.
施工工艺
construction technology
冷再生机租赁
Cold regeneration machine leasing
1、准备下承层
1. Prepare the lower layer
下承层外表应平整、坚实,具有规则的路拱,下承层的平整度和压实度应契合标准规则。
The surface of the lower layer should be flat and solid, with regular road arches. The flatness and compaction of the lower layer should comply with standard rules.
新完成的底基层或土基,必需按标准规则停止验收。凡验收不合格的路段,必需采取措施,使其到达规范后,方可铺筑水泥改进土层。
Newly completed subbase or soil foundation must be stopped for acceptance according to standard rules. For sections that fail the acceptance inspection, measures must be taken to ensure that they meet the standards before laying cement to improve the soil layer.
2、施工放样
2. Construction layout
(1)土基上恢复中线,直线段每15~20m设一桩,平曲线段每10~15m设一桩,并在两侧路肩边缘外设指示桩。
(1) Restore the centerline on the soil foundation, set up one pile every 15-20m for straight sections, and one pile every 10-15m for flat curve sections, and set up indicator piles outside the edges of the shoulders on both sides.
(2)在两侧指示桩上用明显标志标出水泥稳定土层边缘的设计高。
(2) Mark the design height of the cement stabilized soil layer edge with clear signs on both sides of the indicator piles.
3、摊铺土
3. Spreading soil
依据经历肯定素土松铺系数为1.25~1.3,采用机械将土平均地摊铺在预定的宽度上,外表应平整,并有规则的路拱。
Based on experience, the coefficient of loose paving of plain soil is confirmed to be between 1.25 and 1.3. The soil should be evenly spread on the predetermined width using machinery, with a flat surface and regular road arches.
4、洒水闷料
4. Watering and sealing materials
如已整平的土含水量过小,应在土层上洒水闷料。洒水应平均,避免呈现部分水分过多的现象。细粒土应经一夜闷料。
If the moisture content of the leveled soil is too low, water should be sprayed on the soil layer to seal the material. The watering should be evenly distributed to avoid excessive water content in some areas. Fine grained soil should undergo overnight compaction.
冷再生施工租赁场地的准备工作相关事项就讲解到这里了,希望能够给您好的帮助,更多事项就来我们网站https://www.sddhfjx.com咨询吧!
That's all for the preparation work related to the rental site for cold recycling construction. We hope to provide you with good help. For more information, please come to our website https://www.sddhfjx.com Consult!