水泥撒布车和冷再生机在道路施工过程中的应用
来源:https://www.sddhfjx.com/ 日期:2023-04-17
针对实际的道路维修,须要水泥撒布车和冷再生机共同出战进行,大概的修理措施就是先选择检验样本开展抽样解析,随后对须要再造的地面开展就地冷再生检修,随后在派撒布车上场洒布水泥。那么其具体施工过程是什么呢?接下来水泥撒布车出租厂家小编就来介绍一下。
For actual road maintenance, cement spreaders and cold recycling machines need to work together. The general repair measure is to first select inspection samples for sampling analysis, then carry out on-site cold recycling maintenance on the ground that needs to be rebuilt, and then dispatch spreaders to sprinkle cement on site. So what is the specific construction process? Next, the editor of the cement spreader rental manufacturer will introduce it.
施工流程
Construction process
1、水泥撒布
1. Cement spreading
依照配比布置的混凝土剂量和再造材质的高干密度等数剧,测算获得每平米的混凝土净重,选用水泥自动撒布车在地面上均匀洒布混凝土。
Calculate the net weight of concrete per square meter based on the dosage of concrete arranged in the ratio and the high dry density of the recycled material. Use a cement automatic spreader to evenly distribute the concrete on the ground.
2、冷再生机施工
2. Cold regeneration machine construction
对半幅4.6m地面应用WR240开展就地再造,2.4m的铣刨宽度2次工作就可成功半幅施工,WR240再生机铣刨拌和深度为20cm,行驶速度为7m/min。
On site reconstruction of half 4.6m of ground using WR240 can be successfully carried out with a milling width of 2.4m in two operations. The milling and mixing depth of WR240 recycling machine is 20cm, and the driving speed is 7m/min.
水泥撒布车出租
3、平整和夯实
3. Leveling and compaction
WR240就地再生结束后,1台26吨单钢轮压路机随后开展静压1遍,随后平地机开展平整;接着,26吨单钢轮压路机开展强振夯实3遍和弱振3遍进行复压,终使用26吨胶轮压路机夯实5遍成功终压。
After WR240 local regeneration, a 26 ton single drum roller will be statically pressed once, and then the grader will be leveled; Next, a 26 ton single steel wheel roller was used to carry out strong vibration compaction for 3 times and weak vibration compaction for 3 times for re compaction, and finally, a 26 ton rubber wheel roller was used to compact 5 times successfully for final compaction.
4、遮盖养生
4. Covering for health preservation
击实结束的道路,马上应用水车匀称喷撒一遍水,并遮盖复合土工膜开展养生7天,养生期内上、下午各撒水一次。
After the compaction is completed, the road should be immediately sprayed with water evenly by a water truck, and the composite geomembrane should be covered for 7 days of curing. During the curing period, water should be sprinkled once in the morning and once in the afternoon.
以上就是水泥撒布车和冷再升机在现实公路施工中的施工流程內容了,在具体运用中,更为强大的动力,更加节约了土建工程时间,提升了施工效率,防止了由于人工操作导致的不良影响危害,同时很大的节约了人才资源和时间,充分确保了全部项目的品质。更多相关内容就来我们网站https://www.sddhfjx.com咨询了解吧!
The above is the construction process of cement spreaders and cold reheaters in real highway construction. In practical applications, they have more powerful power, save more time in civil engineering, improve construction efficiency, prevent adverse effects and hazards caused by manual operation, and greatly save talent resources and time, fully ensuring the quality of all projects. For more related content, come to our website https://www.sddhfjx.com Consult and understand!