欢迎访问山东途畅路桥工程有限公司网站!

冷再生机租赁,水泥撒布车出租

施工租赁热线

18264104888

您现在所在的位置 :首页 - 新闻中心 > 行业资讯
行业资讯

冷再生机的相关施工要求
来源:https://www.sddhfjx.com/ 日期:2023-03-15
冷再生机是一种高效率、多用途的施工机械。主要用于公路、城乡道路、机场、码头、停车场等工程的基层、底层稳定土现场就地拌和作业。今天冷再生机租赁公司就为大家介绍一下冷再生机的施工要求有哪些。
The cold regenerator is a high-efficiency and multipurpose construction machine. It is mainly used for on-site mixing of base and bottom stabilized soil in highway, urban and rural roads, airports, docks, parking lots and other projects. Today, the cold regenerator leasing company will introduce the construction requirements of the cold regenerator.
1、使用冷再生机施工前要调好水泥浆的稠度并拌合均匀,水泥浆中的杂质和硬块应用滤网滤出,以免堵塞喷嘴;事先调试好喷嘴的喷浆量,以保证水泥剂量准确。
1. Before using the cold regenerator for construction, the consistency of the cement slurry shall be adjusted and mixed evenly. The impurities and hard lumps in the cement slurry shall be filtered out by the filter screen to avoid blocking the nozzle; Adjust the spray quantity of the nozzle in advance to ensure the accurate cement dosage.
2、开始施工时速度不要太快,为满足设计和质量要求,要经常检查拌合的均匀情况和深度,发现与设计有差异时要及时调整。
2. The construction speed should not be too fast at the beginning. In order to meet the design and quality requirements, the uniformity and depth of mixing should be checked frequently, and the difference with the design should be adjusted in time.
3、作业施工水罐车停车时一定要离开已施工或待施工水泥已摊铺路面,以防止漏水引起的局部水大。
3. When the construction water tank truck stops, it is necessary to leave the paved cement pavement that has been constructed or to be constructed to prevent local water leakage.
4、施工车辆停放时一定要错开第二天的第一段第一道预工作面,以防止耽误第二天的人工水泥摊铺。
4. When parking construction vehicles, the first pre-working surface of the first section of the next day must be staggered to prevent delaying the manual cement paving of the next day.
5、避免犯"过压"的错误,即过度压实。若达到材料的最大密实度后仍然继续碾压,则会破坏材料,反而降低其密实度。
5. Avoid the mistake of "over compaction", that is, over compaction. If rolling continues after reaching the maximum compactness of the material, it will destroy the material and reduce its compactness.
冷再生机租赁
6、冷再生机的施工作业应该在每天下午15:00-16:00之间结束,以便后续施工能在天黑前结束。
6. The construction of the cold regenerator should be completed between 15:00-16:00 every afternoon, so that the subsequent construction can be completed before dark.
7、每天冷再生机结束施工进行洗刀停车后,应通知操作手仔细检查车况并更换刀头,以免耽误第二天的施工进度。
7. After the construction of the cold regenerator is finished and the cutter is washed and stopped every day, the operator should be notified to carefully check the vehicle condition and replace the cutter head to avoid delaying the construction progress of the next day.
8、冷再生机拌合过程中要经常检查拌合机刀头的磨损情况和水泥浆车的喷嘴,刀头磨损严重要及时更换,喷嘴发生堵塞要及时疏通。
8. During the mixing process of the cold regenerator, the wear of the cutter head of the mixer and the nozzle of the cement slurry truck should be regularly checked. The cutter head should be replaced in time if it is seriously worn, and the nozzle should be unblocked in time if it is blocked.
9、冷再生机拌合时将整个半幅分成3次拌合,用完水泥浆车内已知重量水泥后,核算已经作业的面积与水泥消耗是否相符,及时做出调整。作业结束,放出剩余水泥浆。
9. When mixing with the cold regenerator, the whole half is divided into three times. After using up the known weight of cement in the cement slurry truck, check whether the area that has been worked is consistent with the cement consumption, and make adjustments in time. At the end of the operation, discharge the remaining cement slurry.
以上就是小编整理的关于冷再生机施工要求的介绍,希望对您使用冷再生机有所帮助。更多关于该设备以及设备租赁的事项就来我们网站https://www.sddhfjx.com进行咨询了解吧!
The above is the introduction about the construction requirements of the cold recycling machine compiled by Xiao Bian, hoping to help you use the cold recycling machine. For more information about the equipment and equipment leasing, please visit our website https://www.sddhfjx.com Consult and understand!
  • 上一条:撒布车相较于人工撒布具有哪些技术优势
  • 下一条:路拌机自动调平控制体系用于修建的细节
  • 相关产品: