使用冷再生机路面平整工作是如何进行的?
来源:https://www.sddhfjx.com/ 日期:2021-02-19
冷再生机技术已经是道路施工中较为常见的一种机器了,在使用冷再生机后的路面平整工作该如何进行呢?
Cold regeneration technology is a common machine in road construction. How to carry out the pavement leveling after using cold regeneration technology?
压路机对再生层稳压后,再生材料基本能够处于稳定状态,但仍不能完全消除再生机的轮迹,此时的轮迹深度约为0.5~1cm。
After the roller stabilizes the regenerated layer, the regenerated material can be basically in a stable state, but the wheel trace of the roller can not be completely eliminated. At this time, the depth of the wheel trace is about 0.5 ~ 1cm.
当完成两幅再生并全部稳压后,用平地机进行整平,一遍整平的目的是消除一幅、二幅右侧共三排轮迹。二遍整平主要是为了把刮刀前的再生料均匀地摊开,同时兼顾再生层的横向、纵向的坡度。然后再进行全作业段的找平。
After the regeneration of the two frames is completed and all of them are stabilized, the grader is used for leveling. The purpose of one leveling is to eliminate a total of three rows of wheel tracks on the right side of the first and second frames. The secondary leveling is mainly to spread the recycled material evenly in front of the scraper, and take into account the transverse and longitudinal gradient of the recycled layer. Then the leveling of the whole operation section is carried out.
平地机对再生层找平后,如仍存在轮迹、麻面、局部骨料集中等现象,则需人工进行修补。方法是用再生新料将轮迹、麻面填满,所用新料应高出再生层0.5cm;将集中的骨料撒开,并用新料填充骨料的缝隙。
After leveling the reclaimed layer by grader, if there are still wheel tracks, pockmarked surface, local aggregate concentration and other phenomena, it needs to be repaired manually. The new material should be 0.5cm higher than the recycled layer; the concentrated aggregate should be scattered, and the gap of aggregate should be filled with new material.